The energy business of General Electric, spun off as a separate company on 2 April 2024 (NYSE: GEV), which makes the largest installed fleet of gas turbines in the world, onshore and offshore wind turbines, grid equipment and — through a joint venture with Hitachi — the BWRX-300 small modular reactor. For most of the decade before the spin-off the same businesses were GE's problem: the ~$10bn purchase of Alstom's power assets in 2015 was followed by a ~$22bn goodwill write-down in 2018, years of losses in wind, and a blade failure at Vineyard Wind off Massachusetts in July 2024. Then demand for firm power from US utilities and data centres outran factory capacity. At 30 September 2026 GE Vernova reported a gas-equipment backlog plus slot reservations of ~122 GW (64 GW of backlog plus 58 GW of reservations), expected at least 130 GW by year-end against output of ~20 GW a year, priced new gas orders more than 20% above Q4 2025 levels, and carried a total backlog of ~$197bn (company, 28 Oct 2026). Its story is what happens when the same factories go from oversupplied to scarce.

At a glance

Founded
General Electric formed 1892 (Edison General Electric + Thomson-Houston); GE's first power-generation gas turbine 1949 (Belle Isle station, Oklahoma, reported); GE Vernova named Feb 2023 and listed 2 Apr 2024 after GE's three-way break-up (announced 9 Nov 2021)
Headquarters
Cambridge, Massachusetts (corporate); large operations in Schenectady and Greenville, South Carolina (gas turbines), and Europe (former Alstom sites in France, Switzerland and Germany)
Ownership / structure
Public, NYSE: GEV; GE shareholders received 1 GEV share for every 4 GE shares (reported); no controlling holder
Leadership (2026)
Scott Strazik (CEO since the spin-off; previously CEO of GE Gas Power and GE Power); Ken Parks (CFO, verify); Stephen Angel (chair, verify)
Segments
Power (gas turbines and services, nuclear incl. GE Vernova Hitachi Nuclear Energy, steam, hydro); Wind (onshore, offshore, LM Wind Power blades); Electrification (grid solutions, HVDC, transformers incl. Prolec GE, power conversion, software)
Scale
Revenue ~$34.9bn (2024, company); Q3 2026 revenue ~$12.6bn (+27%), orders ~$29.3bn (+96% organic), total backlog ~$197bn (company, 28 Oct 2026); ~75,000+ employees (verify)
Installed base
~7,000 gas turbines worldwide (company claim, verify); GE says its technology helps generate ~25% of the world's electricity (company claim)
Signature moves (incl. failures)
Alstom power acquisition (2015); the 2018 power write-down and HA blade fault; Haliade-X and the offshore bet (2018); spin-off from GE (2024); Vineyard Wind blade failure (2024); the gas-turbine backlog and data-centre orders (2025–26); BWRX-300 at Darlington (2025); Prolec GE buy-out and the grid build-out (2025–26)

8 strategic moves analysed

Each one gets a full strategy file in the companion: context, the decision, the financing, what happened, and the lesson.

  1. 2015

    Alstom Power Acquisition

    Acquisition or merger

  2. 2018

    Haliade X and the Offshore Bet

    Technology bet

  3. 2018

    Power Write Down and the HA Blade Fault

    Restructuring / write-down (failure)

  4. 2024

    Spin Off from GE

    Spin-off

  5. 2024

    Vineyard Wind Blade Failure

    Accident / failure

  6. 2025

    BWRX 300 at Darlington

    Technology bet / construction

  7. 2025

    Gas Turbine Backlog and Data Centre Orders

    Offtake or supply contract / pricing strategy (slot reservation agreements)

  8. 2025

    Prolec GE Buyout and the Grid Build Out

    Acquisition